+1 vote
796 views
by (17,393 points)
bumped by
During the second stage for the Piece of Cake event the bridge is supposed to appear but it's not built yet and I know we're on the second stage because we reached the correct amount of cake golems etc. How long does it take to be built?
by (1,274 points)
I believe it is 1 hour, because according to tibia fandom: "every hour the server will check if all the sugary substances and base material have been delivered. If so, the bridge south of Cormaya will be built and the second stage will begin."

that is, every hour the event checks whether we have the quantity of substances and if so, in the next hour the bridge will be ready.
by (17,393 points)
Mmm, are you sure?

1 Answer

+2 votes
by (112 points)
selected by
 
Best answer

According to both TibiaWiki and TibiaWikiBr, every hour the server will check if enough cake golems were lured into the machines and if they were, it will build the bridge. The timing might sound confusing because we don't know exactly when the "every hour" part is due, and its not dependent on when the cake golem task was completed but when the server is checking if the conditions were met.

Hope my answer was clear

Sources:

https://tibia.fandom.com/wiki/A_Piece_of_Cake
https://www.tibiawiki.com.br/wiki/A_Piece_of_Cake

...